-
Timber piling system
-
Prestigious landscaped gardens
-
Precast panels for ultimate quality and reduced program
-
Integrated modern and innovative purpose built car hoist, car and truck spray booths and repair stations
-
Due to Linx Groups’ high participation and control throughout the design phase and its high level of industrial construction experience, the utilisation of steel and precast structures enable the building to be constructed in 6 months
|